Directed, controlled and managed all aspects of the project including in-house
engineering, procurement, construction, interfaces, administration functions
and all external work undertaken by sub-contractors throughout the supply, construction and commissioning phases of the projects
Expertise in end-to-end experience in project planning, coordination & implementation, managed I Girder activities in precast yard and launched works for the I-Girders
A multi-tasking leader with qualitative experience in formulating strategic plans for construction of Wadi Bridges, Balanced Cantilever Bridges and Cast
In-situ Arc Bridges and undertook pre-cast segment works for balanced cantilever high bridges in casting yard
Skills in planning, executing and spearheading projects involving
designing/design coordination, value engineering, construction
development, construction claims, quality assurance/control, HSE compliance,
contract administration, resource planning
Flair for adopting modern construction methodologies / techniques in
compliance with quality standards
An effective leader with excellent communication, negotiation and
relationship building skills
Plan, execute, and supervise all activities related to precast elements in precast yard per shop drawings for Dualization of BidBid Sur Road project. Achieve client satisfaction by ensuring that all aspects of project are completed on time and according to client specifications. Mitigate risk by monitoring work environment for hazards, working with site staff, identifying possible problems, and collaborating with a wide range of stakeholders to implement solutions. Cross check the incoming drawings, documents for discrepancy, prepare project quality plan, work program, method statements, shop drawings and resolve all engineering and technical issues. Assist in the procurement process, helping to raise material requisition form, arrange for necessary resources and monitor material usage at site. Maintain compliance with regulations by collaborating with a wide range of stakeholders and ensuring the accurate completion of all documentation, including RFIAs, submittals, and shop drawings.
Key Accomplishments
Oversee all I Girder activities in precast yard also involved in the launching works for the I-girders.
Successfully completed all precast segment works for balanced cantilever high bridges in casting yard.
Involved in the construction of Wadi Bridges, Balanced Cantilever Bridges and Cast In-situ Arc bridges.
Actively involved in launching works for precast segments of Balanced Cantilever Bridges.
Have full knowledge of Post Tensioning works.
Guide team of 200 personnel while maintaining responsibility of equipment and materials. Slash loss by calculating quantities to ensure accurate ordering and managing manpower effectively.
Prevent accidents and errors by conducting safety inspections of location and equipment. Provide accurate and appropriate safety advice to supervisors, champion safety, and convey importance of safety to staff.
Contribute to cast in-situ works for bridges.
Supported first phase of construction of Batinah Coastal Road by overseeing all day-to-day aspects of project, including adherence to schedule, safety regulations, and customer specifications.
Key Accomplishments
Completed piling works, sub-structures, and super-structures for bridges. Completed pre-cast I Girders/Beams for Wadi Bridges, cast of in-situ box grinders at interchange area.
Executed Underpass, Box Culverts, Pipe Culverts, Rigid Pavements, and Irish Crossings while at the same time completing construction of Mechanically Stabilized Earth wall panels at casting yard/installation site.
Recognised for consistently meeting construction quality/site safety standards, completing all project documents efficiently, working with other team leaders, and reporting key information to management.
Coordinated construction of pre-engineered double story steel building at GHQ, Rawalpindi. Maintained internal and external control of project by overseeing day-to-day operations to ensure alignment with plans and communicating with clients and consultants. Managed installation of rigid frame columns and rafters on concrete foundation, as well as roofing system that included purlin, roofing installation, ridge capping, roof panel, and skylight.
Key Accomplishment
Aligned project with quality standards and customer requirements by providing comprehensive management, including resource allocation, project planning, reporting, manpower, and billing.